PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilling and compating between column lines D-E Facing South (800x600).jpg Building rebar mats for Stair -4 (3rd Floor) Facing North-East (800x600).jpg Elev. 1,2,3 door frames (3rd Floor) Facing North-East (800x600).jpg Installing and tying rebar mats at Elev. 5,6 (4th Floor) Facing West (800x600).jpg Installing bearing plate boxes at Elev. 1,2,3 (3rd Floor) Facing East (800x600).jpg
Next page Backfilling and compating between column lines D-E Facing South (800x600)
Backfilling and compating between column lines D-E Facing South (800x600)